Empty and underused buildings
Property standing empty, or in a condition that makes letting or lending difficult.
Projects
Explore our current development, see the proposed design and speak with the team behind it.
Proposed development · CGICurrent project / 01
A proposed detached chalet bungalow, designed around open-plan living and a private garden.
2 bedrooms · 2 bathrooms · Approx. 79 m²
Explore the projectThe work we take on
Which category a building falls into changes the consents and the programme, not the method.
Property standing empty, or in a condition that makes letting or lending difficult.
Buildings worth more as something other than what they currently are.
Tired stock brought back to a standard a tenant and a lender will both accept.
Sites where the potential has never been tested through an application.
Work delivered for councils, housing associations and institutional partners.
The drawings above are illustrative of each category of work. They do not depict completed OIKIA projects.
Method
Twenty minutes on the property or the mandate. No cost and no commitment.
Costed line by line — including stamp duty, finance, holding and the VAT position — with the downside case on the same page as the upside.
Heads of terms, funding route, and documents drafted for your own solicitor to review.
Stage by stage, certified before paid, reported monthly until exit.
Begin with a conversation
It is cheaper for both of us than finding out on site. Bring us an address, or a question.
Start a conversation